01About
About this machine
Compact towable diesel 2-cylinder concrete piston pump with S-valve, delivering up to 20 cu yd/hr of concrete, shotcrete and high-strength grouts on space-limited job sites.
02Versions
2 versions of the IMER Booster 20
03Specifications
IMER Booster 20 technical data
04Shipping
Shipping and lead time
- Lead time
- Usually ships in 2–3 weeks. IMER machines come from Italy and some are assembled to order or back-ordered, so we confirm the ship date after you order.
- Delivery
- LTL freight, 7–10 business days in transit. Free to commercial addresses in the contiguous US; residential and/or liftgate delivery adds one flat $75. Ships to the USA and Canada (not to Quebec). Shipping conditions
- Returns
- 30-day returns. Return policy










