Skip to content
IMER PartsUSA

Any format works

Type the number from your parts book, the way it is printed, or a machine name.

  • 3237223
  • 3237-223
  • IMER 3237 223
  • Mix 750

Browse by machine

Call +1 (307) 301-7723

Mon–Fri 8 am–6 pm, Sat 9 am–1 pm (Mountain Time)

Operation and setup

How do I set the phase and direction on a three-phase Step-Up 120?

  • Genuine IMER OEM parts
  • Fit checked

Answer

Plug in, shut the spray jet valve and set the main switch to 1; a blue lamp confirms the line has power. Next pick position 1 or 2 on the phase switch. If the screw rotates the way the manual's figure shows, the phase is right. The other position runs the screw backwards, which is exactly what you use when you need to dump pressure from the hose. A separate switch chooses motor speed 1 or 2. Open the air valve at the jet, or use the remote, and the pump starts turning slowly. Stop once grout has climbed to the mixer, fill the hopper and begin work. If the red lamp is lit, the grid or vibro-screen is missing or seated wrongly.

Was this answer helpful?

Reviewed by our parts specialists from IMER manuals and parts books. Check the part number on your machine or in its parts book before you order. Not sure? Ask a parts specialist.

Keep reading